Now showing items 1-2 of 2

    • Construction of Buyende Town Water Supply System. 

      Mugerwa, Raymond (2021-02-15)
      This project report contains details for the construction of the Buyende Town Water Supply System project, Procurement Reference Number MWE/WSDF-E/WRKS/14-15/00118 from start to practical completion, in which the author ...
    • Water movement control across organic primers for pavements 

      Joloba, James (Makerere University, 2018-09)
      In order to curtail vertical moisture movement through pavement layers, a layer of primer is applied on the top surface of the base. During precipitation, water flows into a porous layer and then moves laterally on top of ...