School of Built Environment (SBE): Recent submissions
Now showing items 41-60 of 347
-
Improvement of health services at Mulago national referral hospital and the city of Kampala project (MKCCAP).
(Makerere University, 2023-09-03)This report thoroughly explains the construction practices that the author participated in as the main contractor’s Quantity Surveyor during the execution of construction works for the improvement of Health services ... -
Assessment of potential areas for eco-tourism development in Rakai district.
(Makerere University, 2024-01-25)Eco-tourism, a form of tourism that emphasizes sustainable practices and the conservation of natural environments, has gained global attention as a viable means of promoting economic development while preserving the ... -
Switchyard riverbank erosion remedial works and upstream slope stabilization works
(Makerere University, 2023-10-30)It is a requirement of students doing a Post Graduate Diploma in Construction and Project Management at the College of Engineering Design Art and Technology in Makerere University to write-up a technical report about ... -
Supervision of Upgrading Mutungo Health Centre II to Health Centre III, In Makindye Ssabagabo Municipal Council, Wakiso District
(Makerere University, 2023-08-07)This report is on construction supervision of proposed upgrade of Mutungo health center 11 to health center 111, Makindye Ssebagabo municipal council. The Author was the Clark of works on this project under the mentorship ... -
The construction of NSSF Pension Towers Phase II on Plots 15A, 15B and 17, Lumumba Avenue and Plot 16 Nakasero Road, Kampala
(Makerere University, 2023)The report details a multitude of construction and project management practices that the author was involved in as part of the Main Contractor’s project management team during the construction of NSSF Pension Towers Phase ... -
Technical project report for the construction of the proposed seven storey staff houses In Arua hospital.
(Makerere University, 2023-07)This report is a summation of all activities/ tasks engaged in during the internship on the construction of the proposed seven storey staff houses’ project in Arua Hospital. The report comprises of four chapters namely; First ... -
Technical project report for mechanical and electrical supervision and design review of the construction of selected structures at Oluvu HCIII, Maracha district.
(Makerere University, 2023)Mechanical and Electrical (M&E) refers to the installation process, servicing, supervision and maintenance of the mechanical and electrical systems in a facility needed for the comfortability of the occupants. In this ... -
Civil works for the rehabilitation of Ishaka-Katunguru road (58KM)
(Makerere University, 2023-06)This report presents a comprehensive analysis of the author’s role and observations as an on-site Contracts Manager; a sub-role to his appointment as a Project Quantity Surveyor on the Civil Works for the rehabilitation ... -
Project report on construction supervision for upgrading Bumugibole Health Centre II to Health Centre III in Bulambuli District Local Government
(Makerere University, 2023-07)This report describes the supervision process of all construction activities meant for Upgrading Bumugibole Health Centre II to Health Centre III under UGIFT Programme. It covers aspects project management practices exercised ... -
Construction of solar water projects in villages of eastern and Karamoja regions in Uganda
(Makerere University, 2023-08-17)The solar water project is a sustainable initiative by Innovation: Africa an Israel based organization aimed at harnessing renewable energy to provide clean and reliable water supply to local communities. The primary ... -
Technical report for the upgrading of Hoima-Butiaba Wanseko road (111km) to paved (bituminous) standard
(Makerere University, 2023-06)This project report contains details about the construction supervision of the civil works for the upgrading of Hoima-Butiaba-Wanseko road project as of June 2023. The report focuses on construction project management ... -
An investigation of the impact of fine aggregate type proportioning on compressive strength of cement concrete
(2023-12-28)Several reinforced concrete buildings have collapsed in Uganda and one of the major causes is poor materials and workmanship. Substandard materials, especially, low-quality cement concrete as construction materials lead ... -
Evaluation of the use of solar pv systems for powering mobile telecommunication towers in Uganda.
(Makerere University, 2023-12-18)As the reliance on telecommunication services increases due to the need to bring education, health, financial services among others closer to the customers as well as people’s desire to feel connected to far away loved ... -
Development of a computerised job plan tool for the procurement planning of design and build projects
(Makerere University, 2023-12-18)Value engineering in procurement processes is a tool for improving cost-savings while meeting the end-user requirements. However, if the value engineering process is not improved, it leads to increased use of capital, which ... -
Civil works for the reconstruction of Mityana - Mubende road (86km) and upgrading of Mityana Town roads (14km)
(Makerere University, 2023-06)This project report gives an account of the Reconstruction of the Mityana-Mubende Main Road (86km) and the Upgrading of Mityana Town Roads (14km). The report focuses on the design update, construction project management ... -
Design and construction of the north ward sewer system Kisoro municipality, Kisoro district.
(Makerere University, 2023-11-30)This report documents the work done by the author during the planning, designing and construction supervision of the Kisoro North Ward Sewer System Under National and Sewerage Corporation in Kisoro District, Western ... -
Predicting construction duration during the planning phase for public building projects in Uganda.
(Makerere University, 2023-12-19)Time overrun is one of the major challenges faced by the construction industry today both nationally and globally. This has partly been attributed to the absence of a scientifically developed mechanism for determining ... -
Construction supervision of upgrade of Kalimon Health Centre II to Health Centre III
(Makerere University, 2023-09)This report gives an account of my involvement in the construction supervision of Upgrade of Kalimon Health Center II to Health III. The project is being implemented by MANGRON INVESTMENT LIMITED at a total contract sum ... -
Technical project report for the construction of the new office block in Pallisa Dlg, Pallisa district.
(Makerere University, 2023-09-22)Makerere University requires Post Graduate Diploma students of Construction and Project Management at the College of Engineering Design Art and Technology to participate in internship and write-up a technical report about ... -
Structural design and supervision of hosanna wholesalers limited at Nansana West 1A Zone, Nansana Municipality
(Makerere University, 2023-06)This report outlines my role and responsibilities as the Project Structural Engineer for the design and supervision of the Hosanna Wholesalers Limited building in Nansana Municipality. The main objective of the Hosanna ...